UB 1016×305×393 is an UB section from the UK Blue Book (SCI P363); HE 1000 x 393 is the closest equivalent in the European (Continental) range. They are close to interchangeable in bending: 18500 cm³ against 18500 cm³ of plastic modulus, a difference of 0.0%. They weigh essentially the same, 392.7 kg/m and 393 kg/m. Both are about 1016 mm deep, so either fits the same construction zone.

Section properties side by side. Bold marks the more favourable value where one is.
PropertyUB 1016×305×393
UB
HE 1000 x 393
HE
Difference
Mass392.7 kg/m393 kg/m-0.1%
Depth1015.9 mm1016 mmsame
Width303 mm303 mmsame
Web thickness24.4 mm24.4 mmsame
Flange thickness43.9 mm43.9 mmsame
Area500 cm²500 cm²same
Second moment, major (Iy)808,000 cm⁴808,000 cm⁴same
Plastic modulus, major (Wpl,y)18,500 cm³18,500 cm³same
Elastic modulus, major (Wel,y)15,900 cm³15,900 cm³same
Second moment, minor (Iz)20,500 cm⁴20,500 cm⁴same
Plastic modulus, minor (Wpl,z)2,170 cm³2,170 cm³same
Radius of gyration, minor (iz)6.4 cm6.4 cmsame
Torsion constant (It)2,330 cm⁴2,330 cm⁴same

UB 1016×305×393 to BS EN 10365:2017; HE 1000 x 393 to EN 10365 · Continental Steel. Difference is expressed relative to HE 1000 x 393.

How to choose between them

On stiffness, HE 1000 x 393 has the larger second moment of area: 808,000 cm⁴ against 808,000 cm⁴, a difference of 0.0%. This matters more often than the strength comparison, because on normal floor spans deflection rather than bending capacity sets the beam size - so if the two are close on modulus but apart on inertia, the stiffer one is usually the better answer even when it is not the stronger one.

Measured as bending capacity per kilogram, the two are equally efficient (47.1 against 47.1 cm³ per kg/m), so on a pure steel-tonnage basis there is nothing to choose between them. The decision comes down to availability, connection detailing and what the rest of the frame uses.

These come from different catalogues, so treat the swap as a design change rather than a like-for-like substitution. UB sections are specified to BS EN 10365:2017 and HE to EN 10365 · Continental Steel; the steel grades, tolerances and available lengths differ, connection details and bolt gauges are set out differently, and the two are rarely both stocked in the same market. Check availability before changing a section on a drawing to save a marginal amount of weight.

In short, these two are genuine equivalents. Pick whichever your supplier stocks and the rest of the frame already uses.

Common questions

They are effectively equal in bending. UB 1016×305×393 has a plastic modulus of 18500 cm³ and HE 1000 x 393 has 18500 cm³, a difference of only 0.0% - within the margin that section choice normally turns on. Compare stiffness and availability instead.

Neither meaningfully: UB 1016×305×393 is 392.7 kg/m and HE 1000 x 393 is 393 kg/m. On a tonnage basis they cost the same.

Structurally it is the closest equivalent we hold: HE 1000 x 393 gives 18500 cm³ of plastic modulus and 808,000 cm⁴ of inertia against 18500 cm³ and 808,000 cm⁴. But they are from different catalogues (BS EN 10365:2017 and EN 10365 · Continental Steel), so this is a design change, not a drop-in swap: re-check deflection, connection detailing and local availability.

HE 1000 x 393, with a second moment of area of 808,000 cm⁴ against 808,000 cm⁴ (0.0% more). Deflection under a uniform load goes as 5wL⁴/384EI, so it is inversely proportional to I - on a span where the deflection limit governs rather than strength, this is the number that decides the section.